Bear Creek Track Remediation – Dugger, IN
CLIENT:
The Indiana Rail Road Company
START DATE:
May 2023
END DATE:
May 2023
PROJECT TYPE:
Track Maintenance
PROJECT ROLE:
As-built survey, Design and Construction Layout
PROJECT DESCRIPTION:
Surveyed existing conditions of the railroad tracks. Designed the lowering or the track. Monitored the undercutting of the track to achieve designed top of rail.